Two 40x60 metre tents have been installed in Al Ain Raceways car park. It is a requirement that the Grand Finals paddock is under cover, and these tents are also equipped with lights and a power supply. The skeleton took 4-5 days to go up, but its amazing at how quickly the canopy and side partitions went on. Now comes the arduously difficult task of marking out all of 264 driver bays!
Designed and Developed by clicks N hits |
||||||||||||||||